Home     About Us     Partners     Clients     Experiences     Testimoni     Magang     Member

twittergoogle+linkedin

Testindo Experiences

PLN Batu Bara – Labuan Batu (2012)

Vibration surveillance coal crusher machine

Multi Nitrotama Kimia (2013)

Jasa shaft alignment compressor-steam turbine

Multi Nitrotama Kimia (2013)

Onsite Balancing Blower Fan RB2

(2013)

Onsite Balancing Blower Fan RB1

Turbin (2013)

Shaft Alignment Services Compressor Steam

Adyawinsa Karawang (2012)

Vibration Monitoring Foundation Mesin CMM

Trisula Abadi (2012)

Jasa shaft alignment equipment Turbine Generator 6 MW

Poso (2012)

Commissioning Turbine di PLTMH Sawidago II

Sucofindoperke Pekanbaru (2011)

Pengukuran Vibrasi Pompa untuk Project PT. Chevron pacific Indonesia sebanyak 16 Unit

Pertamina EP Subang (2011)

Inspeksi dan pemeriksaan 1 unit Amine Pump di CO2 removal cilamaya beserta failure assessment